top of page

SHED CLADDING COMMENCES!!!!

  • Writer: shamen27
    shamen27
  • Oct 31, 2016
  • 1 min read

As can be seen in the Gallery Page for the Mk3 layout, helped by my good mate TERRY HOBBS, the cladding of the shed has commenced to a degree that all four lower walls of the shed are now clad and ready. The next stage will involve fitting the timber frame work in for the lower running boards which will hold the storage yard and ramps giving access to the next level.

During cladding, we have had to allow for a few future things such as a power feed to the shed, the entrance and exit points for the proposed Garden section of the layout, as well as access to areas of the layout which will be difficult once the running boards are in place.

 
 
 

Comments


Featured Posts
Recent Posts
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2021 COLIN SMITH. Constructed by Wix.com

bottom of page