top of page

COLCESTER INTERNATIONAL - March 2021 Plan Revision

A recent trip up to the shed to check everything was okay after the Winter has given me a moment of reflection and a new direction in which to take the rebuild of Colcester.

A new revised plan has been drawn up to allow easier access to the shed. It has become apparent that my recent health issues have left me not as agile or as strong as i previously was, thus getting in and out of the shed by ducking under the boards is not now a very feasible prospect.

The solution however, was simple in idea but difficult in execution...

The new revised plan gives the access i require, but in the course of changing things about a bit, we have lost some ideas from the present and previously proposed layout and had a few more moved or expanded upon.

The most notable loss is the removal of the DC line... the layout proposal here is to continue fully DCC. Other factors included the retention of the Furman Smithy village board which is 99% complete anyway, and making the garden loop a more inclusive experience rather than just a fancy add-on.


More information can be found on the REBUILD PAGE if you follow the link HERE




 

Comments


Featured Posts
Recent Posts
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2021 COLIN SMITH. Constructed by Wix.com

bottom of page