The OHE Ski system fitted...!!
- COLIN SMITH
- Jun 23, 2018
- 1 min read
We have fitted the first four OHE Ski`s for the pantograph to run off the Dapol wires and run under the upper boards without obstruction. The design was tweaked a bit from the previous sketched plan and can be seen in the pictures below.
We will soon be proceeding with the upper boards starting at the Station end and working along towards the Depot site and up to the junction near the Shed door. Then we will commence on the inner scenic route running at the same level which will eventually cross a river and runs back to the Station. Once these boards are in place, track laying will resume to link up the two Shed circuits...
Busy times ahead...!!!
Here is the most recent Gallery...