Tree`s, OHLE and Trains...
- COLIN SMITH
- Mar 24, 2019
- 1 min read
With the arrival in the post of 70 assorted trees, work up in the shed on this day was a mix of tree planting and other jobs. The mix of colours now displayed on Colcester is quite a contrast to the bare boards from which it started life as. There will be further additions of such scenery as I continuer to move around the boards anti-clockwise.
Also, I have added two more of the lattice gantry OHLE Masts on the Four Track Section either side of the Depot Road Bridge. These along with a couple of masts to be added under the bridge itself will carry the wires along this section. In addition some proprietary work was done on the Power Feed Station with a mast added and feeder wires attached to the catenary at this point.
And the second platform edge of Furman Smithy Station was put in place and the track ballasted through the station.
And of course, we ran some trains too!!!
For GALLERY pictures CLICK HERE
For VIDEO footage CLICK HERE



